Manufacturing · Building Materials and Architectural Products

EDI and API Integration for Architectural Glass and Glass Product Manufacturers

Architectural glass makers sell float, coated and fabricated glass to glaziers, fabricators and window makers, often cut to size. ECOM connects cut-list orders, rack and crate shipments, freight and invoices to your ERP so sizes, coatings and lots stay exact.

View all manufacturing industries

What this covers

Products and business models in architectural glass and glass product

Products

  • Float and coated glass
  • Insulated glass units
  • Tempered and laminated glass
  • Specialty and decorative glass

Business models

  • Glass producers selling to fabricators
  • Fabricators selling to glaziers and builders
  • Window and door manufacturers

Scenarios

Where architectural glass and glass product manufacturers lose time and margin

Recurring problems for this kind of business, how ECOM connects the systems and documents involved, and what you gain. Bring your own example and we will work through it with you.

  • Cut-to-size orders

    The problem
    Lines have exact dimensions and coatings that must pass through intact.
    How ECOM helps
    ECOM maps cut-to-size dimensions and coatings into the ERP exactly and carries them onto the notice.
    What you gain
    Pieces are ordered, produced and described the way they were specified.

    Talk to an EDI/API Expert about cut-to-size orders Share a sample 850 Purchase Order and 856 Advance Ship Notice, or describe what goes wrong, and we will show how it would map to your ERP.

  • Fragile, heavy freight

    The problem
    Glass ships on racks and in crates with specific handling.
    How ECOM helps
    ECOM builds the 856 at rack, crate and piece level so claims can be traced.
    What you gain
    Damage is researched against the piece on the notice.

    Talk to an EDI/API Expert about fragile, heavy freight Share a sample 856 Advance Ship Notice and 214 Transportation Carrier Shipment Status Message, or describe what goes wrong, and we will show how it would map to your ERP.

  • Project coordination

    The problem
    Glazing is scheduled to construction.
    How ECOM helps
    ECOM posts project releases and revised dates through the order, 855 and shipping plan.
    What you gain
    Glazing deliveries follow the construction schedule.

    Talk to an EDI/API Expert about project coordination Share a sample 860 Purchase Order Change Request, 855 Purchase Order Acknowledgment and 856 Advance Ship Notice, or describe what goes wrong, and we will show how it would map to your ERP.

Who you connect with

Trading relationships for architectural glass and glass product manufacturers

Typical relationships. Which of them apply, and how each one wants to connect, depends on your business.

Fabricators and glaziers
Order cut lists.
Window and door makers
Order stock sizes.
Builders and architects
Specify projects.
Sand, coating and spacer suppliers
Supply materials.
Specialty carriers
Haul glass.

Typical workflow

Where ECOM connects your systems and trading partners

The pattern below is typical for architectural glass and glass product manufacturers, not one partner's confirmed requirements. Each trading partner publishes its own guide; confirm the details with that partner.

  1. Fabricator or glazier→Your plant and ERP 850 Purchase Order Dimensions, thickness, coating and quantity per line.
  2. Fabricator or glazier→Your plant and ERP 860 Purchase Order Change Request Changes to open orders: quantities, dates or cancellations.
  3. Your plant and ERP→Fabricator or glazier 855 Purchase Order Acknowledgment The order acknowledgment: confirms the order or reports differences from what was requested, including dates.
  4. Your plant and ERP→Fabricator or glazier 856 Advance Ship Notice Rack, crate and piece detail.
  5. Your plant and ERP→Fabricator or glazier 810 Invoice Bills for what was shipped, tied to the order and the ship notice.
  6. Your plant and ERP→Material supplier 850 Purchase Order Purchase orders for sheet glass and coatings with quantities and requested delivery dates.
  7. Material supplier→Your plant and ERP 856 Advance Ship Notice Glass rack, sheet and crate detail with size and quantity, used to plan receiving and check against the order.

The diagram draws the exchanges between the lanes shown. Motor-carrier and warehouse documents (204, 990, 214) are listed in the table below with the direction each travels.

  1. Receive cut-list orders

    Orders (850) arrive with dimensions, thickness, coating and quantity per line.

  2. Confirm dates

    Acknowledgments (855) state ship dates that reflect the cutting schedule.

  3. Ship by rack or crate

    Tenders (204/990) and status (214) follow the specialized freight.

  4. Send the ship notice

    The 856 lists racks, crates and pieces so receiving can check them.

  5. Invoice

    The 810 bills by area or piece and ties to the order.

EDI and API exchanges

The documents behind the workflow

X12 transaction sets typical for this workflow, with what each carries here. Select a code for the full transaction reference.

DocumentDirectionWhat it carries for architectural glass and glass product manufacturers
850 Purchase Order You receive Dimensions, thickness, coating and quantity per line.
860 Purchase Order Change Request You receive Changes to open orders: quantities, dates or cancellations.
855 Purchase Order Acknowledgment You send The order acknowledgment: confirms the order or reports differences from what was requested, including dates.
204 Motor Carrier Load Tender You send Tenders a truck shipment to a motor carrier.
990 Response to a Load Tender You receive The motor carrier’s acceptance or decline of the tender.
214 Transportation Carrier Shipment Status Message You receive Shipment status events from the motor carrier.
856 Advance Ship Notice You send Rack, crate and piece detail.
810 Invoice You send Bills for what was shipped, tied to the order and the ship notice.
850 Purchase Order (supplier side) You send Purchase orders for sheet glass and coatings with quantities and requested delivery dates.
856 Advance Ship Notice (supplier side) You receive Glass rack, sheet and crate detail with size and quantity, used to plan receiving and check against the order.

Other exchanges you may meet

  • Fabricator ordering software
  • Project portals

Where a trading partner offers an API, a portal or file exchange instead of EDI, ECOM scopes that connection alongside the EDI ones. Functional acknowledgments (997 or 999) report validation results, including rejection; they do not prove business acceptance or ERP posting. Which acknowledgments and business responses each partner expects is confirmed with that partner.

Operational detail

Dimensions, racks and breakage

Dimensional accuracy and rack-level detail matter, and a damage claim needs a clear record of which pieces were on which rack. Orders carry coatings and treatments that must pass through intact from order to cut list.

  • Dimensions and units of measure

    Products sell by the piece, box, square foot, linear foot, pallet or bundle. Orders, ship notices and invoices must agree on units and conversions, or quantities and prices disagree.

  • Jobsite and yard delivery

    Deliveries go to branches, yards and jobsites, sometimes with delivery appointments or special equipment. Ship-to detail and carrier information are part of the exchange.

  • Distributor orders

    Most volume moves through distributors, dealers and home centers that send their own orders, changes and inventory or sales data.

Connected systems

Systems that send and receive this data

Documents are only useful when they reach the systems that run the business.

  • ERP with cut-list handling
  • Optimization software
  • Transportation management
  • Fabricator portals

Onboarding and monitoring

From first requirement to daily exception handling

  1. Confirm the requirement

    Obtain each partner's implementation guide or specification, for example from your fabricator or glazier, and agree which documents, versions and data are in scope.

  2. Map to your systems

    Map each document to the fields in your ERP with cut-list handling and optimization software so the data posts without re-keying.

  3. Test with the partner

    Exchange test documents and review the results with the partner before go-live, including changes, cancellations and error cases, not only the simple order.

  4. Validate, acknowledge and monitor

    A 997 or 999 reports the validation result of the document as received, including rejection; it does not show that the business accepted the content or that your ERP posted it. Business responses are separate: an 855 for orders, an 824 for application errors. Monitoring can show what is late, missing or rejected, once it is set up with you.

  5. Resolve exceptions

    Which failures and late documents are watched, who is alerted and how each is resolved are agreed during onboarding. Rejected or unacknowledged documents can then go to the people who can fix them, with the document and the reason in view.

Example exceptions for architectural glass and glass product manufacturers

Illustrative exceptions and example handling that depends on configuration, not live data
ExceptionExample handling, once configured
Dimension outside what the plant can produceThe line can be held for review and returned to the customer for correction before cutting is scheduled.
Damage reported at receiptRack and piece detail on the 856 can help trace a claim so the carrier and fabricator can resolve it.

Illustrative examples of exceptions a team in this industry may need to review. Each check compares data from your ERP, WMS, trading partner documents or scans, where those are available. Which conditions are checked, who is alerted and what happens next are configured with you during onboarding. This is not a screenshot of a live system or a list of built-in checks.

How ECOM helps

ECOM products and services that apply

Each partner connects in the way it can support. These products cover the connections and visibility manufacturers need most.

  • PRISM-EDI

    Exchange of schedules, orders, ship notices and invoices with customers and suppliers in X12 or EDIFACT, translated to and from your ERP.

  • PRISM-WebEDI

    Browser-based purchase orders, acknowledgments, ship notices and invoices for suppliers without EDI systems.

  • PRISM-SmartConvert

    Supplier confirmations, invoices and customer orders that arrive as PDFs, emails or scans converted into ERP-ready data.

  • PRISM-SCV

    Monitoring of transactions and exceptions across customer and supplier documents.

Frequently asked questions

Can cut lists arrive electronically?

Yes, as orders or files, depending on the customer’s software. ECOM maps the dimensions, coatings and quantities to your ERP so pieces are scheduled without re-keying.

Does ECOM optimize glass cutting?

No. Cutting optimization stays in your production software. The integration brings the order in and returns confirmations, ship notices and invoices.

How are units of measure and conversions kept consistent?

Item and unit conversions are agreed during mapping, so a quantity ordered in boxes can be shipped and invoiced in the unit the trading partner expects. They are part of the partner’s implementation guide and tested before go-live.

Do you need our trading partner's implementation guide to start?

It helps, but you can start without one. Tell us who you trade with and which systems you run, and we will help obtain and review each partner's requirements. The guide, not this page, decides the exact documents, versions and rules for that partner.

Talk to an EDI/API expert about architectural glass and glass product manufacturers

Share your trading partners, your ERP, a sample document or the problem that keeps recurring. A completed specification is not needed: a partner guide, a rejected document or a description of the issue is enough to start.