Manufacturing · Metals, Machinery and Industrial Equipment
EDI and API Integration for Conveyor, Forklift and Material Handling Equipment Manufacturers
Conveyor, forklift and material handling equipment makers sell configured equipment and parts through dealers and integrators to warehouses and plants. ECOM connects dealer orders, project milestones, serial shipments and parts business to your ERP.
What this covers
Products and business models in conveyor, forklift and material handling equipment
Products
- Conveyors and sortation
- Forklifts and lift trucks
- Racking, docks and handling equipment
- Parts, batteries and attachments
Business models
- Manufacturers selling via dealers
- Integrator project sales
- Rental and fleet programs
Scenarios
Where conveyor, forklift and material handling equipment manufacturers lose time and margin
Recurring problems for this kind of business, how ECOM connects the systems and documents involved, and what you gain. Bring your own example and we will work through it with you.
-
Configured units
- The problem
- Trucks and systems have many options.
- How ECOM helps
- ECOM maps option sets into the ERP’s configuration and holds an order with a conflict for review.
- What you gain
- Configured units are checked when the order posts.
Talk to an EDI/API Expert about configured units Share a sample 850 Purchase Order and 855 Purchase Order Acknowledgment, or describe what goes wrong, and we will show how it would map to your ERP.
-
Fleet and rental flows
- The problem
- Fleet programs add recurring delivery and return.
- How ECOM helps
- ECOM carries fleet and rental deliveries and returns through the same connection.
- What you gain
- Recurring deliveries and returns are tracked.
Talk to an EDI/API Expert about fleet and rental flows Share a sample 850 Purchase Order, 856 Advance Ship Notice and 180 Return Merchandise Authorization and Notification, or describe what goes wrong, and we will show how it would map to your ERP.
-
Parts volume
- The problem
- Service parts are frequent and urgent.
- How ECOM helps
- ECOM processes urgent service parts orders and returns an 855 quickly.
- What you gain
- Service parts are acknowledged promptly.
Talk to an EDI/API Expert about parts volume Share a sample 850 Purchase Order and 855 Purchase Order Acknowledgment, or describe what goes wrong, and we will show how it would map to your ERP.
Who you connect with
Trading relationships for conveyor, forklift and material handling equipment manufacturers
Typical relationships. Which of them apply, and how each one wants to connect, depends on your business.
- Dealers
- Order units and parts and bring configured orders from their quoting tools.
- Integrators
- Order conveyor and sortation systems for warehouse projects.
- Warehouse and plant owners
- Buy through dealers and integrators.
- Component and battery suppliers
- Supply motors, controls and batteries whose lead times gate builds.
- Carriers
- Deliver large equipment, often to a prepared site.
Partner guides: Distributor guides · Manufacturer guides · Carrier guides
Typical workflow
Where ECOM connects your systems and trading partners
The pattern below is typical for conveyor, forklift and material handling equipment manufacturers, not one partner's confirmed requirements. Each trading partner publishes its own guide; confirm the details with that partner.
- Dealer or integrator→Your plant and ERP 850 Purchase Order The customer order: items, quantities, prices, ship-to and requested dates.
- Dealer or integrator→Your plant and ERP 860 Purchase Order Change Request Changes to open orders: quantities, dates or cancellations.
- Your plant and ERP→Dealer or integrator 855 Purchase Order Acknowledgment The order acknowledgment: confirms the order or reports differences from what was requested, including dates.
- Your plant and ERP→Dealer or integrator 856 Advance Ship Notice Unit serial and configuration per shipment.
- Your plant and ERP→Dealer or integrator 810 Invoice Bills for what was shipped, tied to the order and the ship notice.
- Dealer or integrator→Your plant and ERP 180 Return Merchandise Authorization and Notification Return authorization: which items and quantities are coming back and why.
- Your plant and ERP→Component supplier 850 Purchase Order Purchase orders for motors, drives, steel and controls with quantities and requested delivery dates.
- Component supplier→Your plant and ERP 856 Advance Ship Notice Motor, drive, steel and control shipments with quantity and supplier serial where provided, used to plan receiving against assembly.
The diagram draws the exchanges between the lanes shown. Motor-carrier and warehouse documents (204, 990, 214) are listed in the table below with the direction each travels.
Take configured orders
Orders (850) and changes (860) carry options and delivery details.
Confirm with dates
Acknowledgments (855) restate configuration and build dates.
Deliver
Tenders (204/990) and status (214) follow large equipment.
Send the ship notice with serials
The 856 reports unit and serial detail.
Invoice and parts
The 810 follows delivery; parts orders and returns (180) share the dealer connection.
EDI and API exchanges
The documents behind the workflow
X12 transaction sets typical for this workflow, with what each carries here. Select a code for the full transaction reference.
| Document | Direction | What it carries for conveyor, forklift and material handling equipment manufacturers |
|---|---|---|
| 850 Purchase Order | You receive | The customer order: items, quantities, prices, ship-to and requested dates. |
| 860 Purchase Order Change Request | You receive | Changes to open orders: quantities, dates or cancellations. |
| 855 Purchase Order Acknowledgment | You send | The order acknowledgment: confirms the order or reports differences from what was requested, including dates. |
| 204 Motor Carrier Load Tender | You send | Tenders a truck shipment to a motor carrier. |
| 990 Response to a Load Tender | You receive | The motor carrier’s acceptance or decline of the tender. |
| 214 Transportation Carrier Shipment Status Message | You receive | Delivery status for large equipment. |
| 856 Advance Ship Notice | You send | Unit serial and configuration per shipment. |
| 810 Invoice | You send | Bills for what was shipped, tied to the order and the ship notice. |
| 180 Return Merchandise Authorization and Notification | You receive | Return authorization: which items and quantities are coming back and why. |
| 850 Purchase Order (supplier side) | You send | Purchase orders for motors, drives, steel and controls with quantities and requested delivery dates. |
| 856 Advance Ship Notice (supplier side) | You receive | Motor, drive, steel and control shipments with quantity and supplier serial where provided, used to plan receiving against assembly. |
Other exchanges you may meet
- Dealer portals
- Fleet programs
Where a trading partner offers an API, a portal or file exchange instead of EDI, ECOM scopes that connection alongside the EDI ones. Functional acknowledgments (997 or 999) report validation results, including rejection; they do not prove business acceptance or ERP posting. Which acknowledgments and business responses each partner expects is confirmed with that partner.
Operational detail
Configurations, fleets and parts
A dealer needs to see the configuration it ordered on the acknowledgment and the unit that arrives. Fleet and rental programs add recurring deliveries, and parts business, often urgent, follows the machine serial.
Forecasts, schedules and releases
Customers send forecasts and firm releases that change plans. How they update requirements in the ERP is a planning decision as much as an integration one.
Components and supplier collaboration
Finished equipment depends on many purchased components. Orders, acknowledgments and ship notices to and from suppliers keep builds on schedule.
Configured and spare-part orders
Equipment is often configured to order, and spare parts sell through distributors and dealers with their own order flows.
Connected systems
Systems that send and receive this data
Documents are only useful when they reach the systems that run the business.
- ERP
- Dealer management system
- Transportation management
- Service systems
ERP integration guides: SAP S/4HANA · Infor CloudSuite Industrial (SyteLine) · Epicor Kinetic · QAD MFG PRO · Microsoft Dynamics 365 Business Central · Oracle NetSuite · All ERP guides
Onboarding and monitoring
From first requirement to daily exception handling
Confirm the requirement
Obtain each partner's implementation guide or specification, for example from your dealer or integrator, and agree which documents, versions and data are in scope.
Map to your systems
Map each document to the fields in your ERP and dealer management system so the data posts without re-keying.
Test with the partner
Exchange test documents and review the results with the partner before go-live, including changes, cancellations and error cases, not only the simple order.
Validate, acknowledge and monitor
A 997 or 999 reports the validation result of the document as received, including rejection; it does not show that the business accepted the content or that your ERP posted it. Business responses are separate: an 855 for orders, an 824 for application errors. Monitoring can show what is late, missing or rejected, once it is set up with you.
Resolve exceptions
Which failures and late documents are watched, who is alerted and how each is resolved are agreed during onboarding. Rejected or unacknowledged documents can then go to the people who can fix them, with the document and the reason in view.
Example exceptions for conveyor, forklift and material handling equipment manufacturers
| Exception | Example handling, once configured |
|---|---|
| Option conflict on a configured unit | The order can be held for engineering review so a unit is not built with incompatible options. |
| Delivery date slipping on a project | The slip can be flagged for review so the dealer and integrator can reset the site schedule. |
Illustrative examples of exceptions a team in this industry may need to review. Each check compares data from your ERP, WMS, trading partner documents or scans, where those are available. Which conditions are checked, who is alerted and what happens next are configured with you during onboarding. This is not a screenshot of a live system or a list of built-in checks.
How ECOM helps
ECOM products and services that apply
Each partner connects in the way it can support. These products cover the connections and visibility manufacturers need most.
-
PRISM-EDI
Exchange of schedules, orders, ship notices and invoices with customers and suppliers in X12 or EDIFACT, translated to and from your ERP.
-
PRISM-WebEDI
Browser-based purchase orders, acknowledgments, ship notices and invoices for suppliers without EDI systems.
-
PRISM-SmartConvert
Supplier confirmations, invoices and customer orders that arrive as PDFs, emails or scans converted into ERP-ready data.
-
PRISM-SCV
Monitoring of transactions and exceptions across customer and supplier documents.
Services: Trading partner onboarding · ERP integration · API integration · Fully managed EDI · Supply chain visibility · Mapping and translation
Frequently asked questions
Can dealer management systems connect?
Dealer systems vary, so each is scoped as its own connection to your ERP, alongside your EDI dealers.
Can parts orders be separated from machine orders?
Parts orders arrive like other orders and post to the same ERP, so they can be reported and prioritized separately.
How do schedules and releases update ERP planning?
Schedules are translated and loaded to your ERP or MRP. Whether a new release replaces or adjusts open requirements is agreed with your planners and tested with real schedule changes.
Do you need our trading partner's implementation guide to start?
It helps, but you can start without one. Tell us who you trade with and which systems you run, and we will help obtain and review each partner's requirements. The guide, not this page, decides the exact documents, versions and rules for that partner.
Talk to an EDI/API expert about conveyor, forklift and material handling equipment manufacturers
Share your trading partners, your ERP, a sample document or the problem that keeps recurring. A completed specification is not needed: a partner guide, a rejected document or a description of the issue is enough to start.