Manufacturing · Furniture, Furnishings and Housewares

EDI and API Integration for Curtain, Blind and Window Treatment Manufacturers

Window treatment makers produce curtains, blinds and shades to size for retailers, dealers and designers. ECOM connects measured and standard orders, shipments and invoices to your ERP so custom dimensions travel accurately from order to cut to carton.

View all manufacturing industries

What this covers

Products and business models in curtain, blind and window treatment

Products

  • Curtains and drapery
  • Blinds, shades and shutters
  • Hardware and motorization
  • Ready-made and custom-sized products

Business models

  • Brands wholesale to retailers
  • Custom manufacturers selling through dealers
  • Online made-to-measure

Scenarios

Where curtain, blind and window treatment manufacturers lose time and margin

Recurring problems for this kind of business, how ECOM connects the systems and documents involved, and what you gain. Bring your own example and we will work through it with you.

  • Custom dimensions

    The problem
    Each measured order has width, height and options that must be exact end to end.
    How ECOM helps
    ECOM maps width, height and option fields exactly from the order into your ERP and checks them against allowed ranges.
    What you gain
    Dimensions arrive complete and in range, so fewer remakes.

    Talk to an EDI/API Expert about custom dimensions Share a sample 850 Purchase Order and 860 Purchase Order Change Request, or describe what goes wrong, and we will show how it would map to your ERP.

  • Order errors are costly

    The problem
    A wrong dimension means a remake, so data has to arrive complete and correct.
    How ECOM helps
    ECOM holds an order with a missing or out-of-range dimension for the customer to correct.
    What you gain
    Errors are corrected before cutting rather than after a remake.

    Talk to an EDI/API Expert about order errors are costly Share a sample 850 Purchase Order and 855 Purchase Order Acknowledgment, or describe what goes wrong, and we will show how it would map to your ERP.

  • Retailer and dealer programs

    The problem
    Big-box programs run on standard items while dealers order custom.
    How ECOM helps
    ECOM supports standard items for big-box programs and custom items for dealers in the same connection.
    What you gain
    Both customer types order through one process.

    Talk to an EDI/API Expert about retailer and dealer programs Share a sample 850 Purchase Order, 856 Advance Ship Notice and 810 Invoice, or describe what goes wrong, and we will show how it would map to your ERP.

Who you connect with

Trading relationships for curtain, blind and window treatment manufacturers

Typical relationships. Which of them apply, and how each one wants to connect, depends on your business.

Home improvement and big-box retailers
Order standard sizes.
Dealers and designers
Order custom.
Online sellers
Order made-to-measure.
Fabric, aluminum and component suppliers
Supply materials.
Parcel and LTL carriers
Move cartons.

Typical workflow

Where ECOM connects your systems and trading partners

The pattern below is typical for curtain, blind and window treatment manufacturers, not one partner's confirmed requirements. Each trading partner publishes its own guide; confirm the details with that partner.

  1. Retailer or dealer→Your plant and ERP 850 Purchase Order Width, height and option detail on each line.
  2. Retailer or dealer→Your plant and ERP 860 Purchase Order Change Request Changes to open orders: quantities, dates or cancellations.
  3. Your plant and ERP→Retailer or dealer 855 Purchase Order Acknowledgment The order acknowledgment: confirms the order or reports differences from what was requested, including dates.
  4. Your plant and ERP→Retailer or dealer 856 Advance Ship Notice Describes what is shipping, how it is packed and how it is labeled.
  5. Your plant and ERP→Retailer or dealer 810 Invoice Bills for what was shipped, tied to the order and the ship notice.
  6. Your plant and ERP→Fabric and component supplier 850 Purchase Order Purchase orders for fabric and window-covering components with quantities and requested delivery dates.
  7. Fabric and component supplier→Your plant and ERP 855 Purchase Order Acknowledgment The supplier confirms quantities and dates for fabric and window-covering components.
  8. Fabric and component supplier→Your plant and ERP 856 Advance Ship Notice Fabric roll and component detail with quantity and lot, used to plan receiving and the cutting schedule.
  9. Retailer or dealer→Your plant and ERP 180 Return Merchandise Authorization and Notification Returns and remake authorizations.
  1. Orders with dimensions

    Orders (850) carry sizes and options.

  2. Validate and confirm

    The ERP checks dimensions; acknowledgments (855) confirm.

  3. Cut and assemble

    Production follows the confirmed order.

  4. Ship notice

    The 856 lists orders by carton.

  5. Invoice

    The 810 follows shipment.

EDI and API exchanges

The documents behind the workflow

X12 transaction sets typical for this workflow, with what each carries here. Select a code for the full transaction reference.

DocumentDirectionWhat it carries for curtain, blind and window treatment manufacturers
850 Purchase Order You receive Width, height and option detail on each line.
860 Purchase Order Change Request You receive Changes to open orders: quantities, dates or cancellations.
855 Purchase Order Acknowledgment You send The order acknowledgment: confirms the order or reports differences from what was requested, including dates.
856 Advance Ship Notice You send Describes what is shipping, how it is packed and how it is labeled.
810 Invoice You send Bills for what was shipped, tied to the order and the ship notice.
850 Purchase Order (supplier side) You send Purchase orders for fabric and window-covering components with quantities and requested delivery dates.
855 Purchase Order Acknowledgment (supplier side) You receive The supplier confirms quantities and dates for fabric and window-covering components.
856 Advance Ship Notice (supplier side) You receive Fabric roll and component detail with quantity and lot, used to plan receiving and the cutting schedule.
180 Return Merchandise Authorization and Notification You receive Returns and remake authorizations.

Other exchanges you may meet

  • Dealer order portals
  • Retailer made-to-measure ordering systems

Where a trading partner offers an API, a portal or file exchange instead of EDI, ECOM scopes that connection alongside the EDI ones. Functional acknowledgments (997 or 999) report validation results, including rejection; they do not prove business acceptance or ERP posting. Which acknowledgments and business responses each partner expects is confirmed with that partner.

Operational detail

Dimensions and remakes

Custom lines have measurement fields rather than just SKUs. The mapping has to preserve them exactly, and a configured dimension check can hold an order with an out-of-range value for review when it posts, rather than at the cutting table.

  • Bulky freight and delivery

    Large items ship by LTL or truckload, or to the home. Ship notices, carrier information and delivery appointments matter as much as the order.

  • Multi-carton items and sets

    Furniture, sets and kits can ship in several cartons or pieces. Retailers need the carton structure to receive complete sets.

  • Made-to-order and options

    Finishes, fabrics and configurations create long lead times. Order changes and acknowledgments with promised dates are common.

Connected systems

Systems that send and receive this data

Documents are only useful when they reach the systems that run the business.

  • ERP with configurable products
  • Production cutting systems
  • Dealer portals
  • Warehouse management

Onboarding and monitoring

From first requirement to daily exception handling

  1. Confirm the requirement

    Obtain each partner's implementation guide or specification, for example from your retailer or dealer, and agree which documents, versions and data are in scope.

  2. Map to your systems

    Map each document to the fields in your ERP with configurable products and production cutting systems so the data posts without re-keying.

  3. Test with the partner

    Exchange test documents and review the results with the partner before go-live, including changes, cancellations and error cases, not only the simple order.

  4. Validate, acknowledge and monitor

    A 997 or 999 reports the validation result of the document as received, including rejection; it does not show that the business accepted the content or that your ERP posted it. Business responses are separate: an 855 for orders, an 824 for application errors. Monitoring can show what is late, missing or rejected, once it is set up with you.

  5. Resolve exceptions

    Which failures and late documents are watched, who is alerted and how each is resolved are agreed during onboarding. Rejected or unacknowledged documents can then go to the people who can fix them, with the document and the reason in view.

Example exceptions for curtain, blind and window treatment manufacturers

Illustrative exceptions and example handling that depends on configuration, not live data
ExceptionExample handling, once configured
Dimension outside allowed rangeA dimension check against the allowed range can hold the order for the customer to correct.
Remake order linked to originalA remake order can be linked to its original in the ERP for cost tracking.

Illustrative examples of exceptions a team in this industry may need to review. Each check compares data from your ERP, WMS, trading partner documents or scans, where those are available. Which conditions are checked, who is alerted and what happens next are configured with you during onboarding. This is not a screenshot of a live system or a list of built-in checks.

How ECOM helps

ECOM products and services that apply

Each partner connects in the way it can support. These products cover the connections and visibility manufacturers need most.

  • PRISM-EDI

    Exchange of schedules, orders, ship notices and invoices with customers and suppliers in X12 or EDIFACT, translated to and from your ERP.

  • PRISM-WebEDI

    Browser-based purchase orders, acknowledgments, ship notices and invoices for suppliers without EDI systems.

  • PRISM-SmartConvert

    Supplier confirmations, invoices and customer orders that arrive as PDFs, emails or scans converted into ERP-ready data.

  • PRISM-SCV

    Monitoring of transactions and exceptions across customer and supplier documents.

Frequently asked questions

Can measured orders arrive by EDI?

Where the customer’s system can send measurements in the order, they are mapped. Otherwise portals or files carry them.

Does the integration validate dimensions?

Validation rules live in your ERP or configurator. The integration passes the data in and the result back.

How are drop-ship orders for large items handled?

Online retailers and marketplaces send orders for direct shipment to the consumer and expect acknowledgments, tracking and invoices back. ECOM connects those orders to your ERP or warehouse and returns the shipment data the retailer requires.

Do you need our trading partner's implementation guide to start?

It helps, but you can start without one. Tell us who you trade with and which systems you run, and we will help obtain and review each partner's requirements. The guide, not this page, decides the exact documents, versions and rules for that partner.

Talk to an EDI/API expert about curtain, blind and window treatment manufacturers

Share your trading partners, your ERP, a sample document or the problem that keeps recurring. A completed specification is not needed: a partner guide, a rejected document or a description of the issue is enough to start.