EDIFACT message guide · Projects and construction
CONITT Invitation to tender
The UN/EDIFACT message a client uses to invite contractors to tender for construction work, with the bill of quantities and conditions.
- Sent by
- Client or client's representative
- Received by
- Main contractor or subcontractor
- Standard
- UN/EDIFACT · Batch message
- X12 equivalent
- No direct equivalent
What is the EDIFACT CONITT message?
CONITT is the UN/EDIFACT invitation to tender. The directory explains that, at the pre-construction stage of a project, the client wishes to appoint a contractor to carry out the works, and the first step is to issue an invitation to tender to contractors, which requires the transfer of the project details and the bill of quantities.
The bill of quantities lists every work item with its description and quantity, so that contractors can price it consistently. Sending it electronically lets contractors load the items into estimating software and return priced tenders (CONTEN) in the same structure.
How to read this diagram: the top row shows who sends CONITT, to whom, and which messages usually come before and after it. The lower part shows what the directory D.21A itself requires: the envelopes around CONITT and the segments and segment groups it marks mandatory. Conditional groups are listed by their trigger segment rather than drawn in full. This is the directory's minimum, not a trading partner's requirement: a message implementation guide, such as an industry subset or a partner’s own guide, usually makes some conditional groups mandatory, restricts the codes and may use an older directory.
When it is used
- Inviting main contractors to tender
- Sending a bill of quantities to subcontractors
- Issuing addenda to a tender
Where it fits in the message flow
Structure
Mandatory segments in CONITT (directory D.21A)
In UN/EDIFACT directory D.21A, the CONITT message has 105 segment positions arranged in 34 segment groups. These are the segments and segment groups marked mandatory at message level, in order; a mandatory group is shown with the segment that starts it. Segments inside conditional groups are needed only when the group is used. This is the directory’s requirement, not your trading partner’s: each partner’s message implementation guide names the directory it uses, often an older one such as D.96A or D.01B where the structure can differ, makes some conditional segments mandatory and restricts the codes.
- UNH
- BGM
- RFF
- DTM
- UNS
- SG22 (BII)
- UNT
Practical example
CONITT in practice
A public works department plans a new bridge. Its quantity surveyor sends five contractors a CONITT with the project details, the bill of quantities of 1,200 work items, the tender conditions and the closing date. The contractors import the items into their estimating systems and return priced CONTEN tenders.
Implementation
Implementation considerations for CONITT
- Keep work item references stable so priced tenders map back to the bill.
- Issue addenda in the same structure as the original invitation.
- Follow the national construction data standard where one applies.
- Set and enforce the tender closing date.
How ECOM helps
Automate CONITT with ECOM
Industry
Industrial Manufacturing
Distributor, OEM customer and supplier integration for industrial manufacturers.
Solution
Procure-to-Pay Automation
Automate purchasing, receiving and supplier invoicing across EDI, portals and documents.
Solution
B2B Integration
Connect every customer, supplier, carrier and bank across EDI, API, file and portal channels.
Compare X12 and EDIFACT, or see answers to general questions in the EDI FAQ.