Manufacturing · Chemicals, Plastics and Rubber

EDI and API Integration for Composite and Fiberglass Product Manufacturers

Composite and fiberglass product makers build molded parts, tanks, boats components and panels to customer drawings, with material lot control. ECOM connects OEM releases, project orders, material purchasing and invoices to your ERP.

View all manufacturing industries

What this covers

Products and business models in composite and fiberglass product

Products

  • Molded composite and fiberglass parts
  • Panels, tanks and enclosures
  • Composite materials and prepreg
  • Marine, transportation and industrial components

Business models

  • Custom molders supplying OEMs
  • Fabricators on project work
  • Material suppliers

Scenarios

Where composite and fiberglass product manufacturers lose time and margin

Recurring problems for this kind of business, how ECOM connects the systems and documents involved, and what you gain. Bring your own example and we will work through it with you.

  • Material lot control

    The problem
    Resin and fiber lots have shelf life and tie to finished parts.
    How ECOM helps
    ECOM carries resin and fiber lot data from supplier 856s into your ERP and onto the finished-part record.
    What you gain
    Material lots tie to finished parts.

    Talk to an EDI/API Expert about material lot control Share a sample 856 Advance Ship Notice and 863 Report of Test Results, or describe what goes wrong, and we will show how it would map to your ERP.

  • Oversize freight

    The problem
    Large parts ship on flatbeds.
    How ECOM helps
    ECOM connects flatbed tenders and status (204, 990, 214) for oversize parts.
    What you gain
    Large parts are planned and tracked.

    Talk to an EDI/API Expert about oversize freight Share a sample 204 Motor Carrier Load Tender, 990 Response to a Load Tender and 214 Transportation Carrier Shipment Status Message, or describe what goes wrong, and we will show how it would map to your ERP.

  • Drawing and revision control

    The problem
    Parts are built to a drawing revision, and the order, production and shipment records need to show the same revision.
    How ECOM helps
    ECOM carries drawing and revision references from the order to the notice.
    What you gain
    Parts ship to the current revision.

    Talk to an EDI/API Expert about drawing and revision control Share a sample 850 Purchase Order and 856 Advance Ship Notice, or describe what goes wrong, and we will show how it would map to your ERP.

Who you connect with

Trading relationships for composite and fiberglass product manufacturers

Typical relationships. Which of them apply, and how each one wants to connect, depends on your business.

OEMs and boat builders
Send releases and drawings for molded parts and panels.
Project customers
Order custom parts and enclosures to drawings.
Resin, fiber and core suppliers
Supply materials with shelf life and lot control.
Tooling suppliers
Supply molds with long lead times.
Flatbed carriers
Haul oversize parts.

Typical workflow

Where ECOM connects your systems and trading partners

The pattern below is typical for composite and fiberglass product manufacturers, not one partner's confirmed requirements. Each trading partner publishes its own guide; confirm the details with that partner.

  1. OEM or project customer→Your plant and ERP 862 Shipping Schedule Supplements the 830: shipping and delivery quantities and dates that, under the partner’s rules, supersede the applicable shipping information in the 830. It does not replace the 830 or, on its own, authorize production resources.
  2. OEM or project customer→Your plant and ERP 850 Purchase Order The customer order: items, quantities, prices, ship-to and requested dates.
  3. OEM or project customer→Your plant and ERP 860 Purchase Order Change Request Changes to open orders: quantities, dates or cancellations.
  4. Your plant and ERP→OEM or project customer 855 Purchase Order Acknowledgment The order acknowledgment: confirms the order or reports differences from what was requested, including dates.
  5. Your plant and ERP→OEM or project customer 856 Advance Ship Notice Part number, revision and material lot.
  6. Your plant and ERP→OEM or project customer 810 Invoice Bills for what was shipped, tied to the order and the ship notice.
  7. Your plant and ERP→Material supplier 850 Purchase Order Purchase orders for fiber, resin and core materials with quantities and requested delivery dates.
  8. Material supplier→Your plant and ERP 856 Advance Ship Notice Fiber, resin and core shipments with the supplier’s material lot and quantity, used to plan receiving and molding.

The diagram draws the exchanges between the lanes shown. Motor-carrier and warehouse documents (204, 990) are listed in the table below with the direction each travels.

  1. Take releases and orders

    Releases (862) and orders (850) specify part, revision and quantity.

  2. Buy materials

    Resin, fiber and core orders (850) and supplier notices (856) support molding.

  3. Mold, finish and inspect

    Production records material lot and revision against each part.

  4. Send the ship notice

    The 856 identifies parts, revision and material lot; flatbed tenders (204/990) move oversize parts.

  5. Invoice

    The 810 follows shipment.

EDI and API exchanges

The documents behind the workflow

X12 transaction sets typical for this workflow, with what each carries here. Select a code for the full transaction reference.

DocumentDirectionWhat it carries for composite and fiberglass product manufacturers
862 Shipping Schedule You receive Supplements the 830: shipping and delivery quantities and dates that, under the partner’s rules, supersede the applicable shipping information in the 830. It does not replace the 830 or, on its own, authorize production resources.
850 Purchase Order You receive The customer order: items, quantities, prices, ship-to and requested dates.
860 Purchase Order Change Request You receive Changes to open orders: quantities, dates or cancellations.
855 Purchase Order Acknowledgment You send The order acknowledgment: confirms the order or reports differences from what was requested, including dates.
204 Motor Carrier Load Tender You send Flatbed tenders for oversize parts.
990 Response to a Load Tender You receive The motor carrier’s acceptance or decline of the tender.
856 Advance Ship Notice You send Part number, revision and material lot.
810 Invoice You send Bills for what was shipped, tied to the order and the ship notice.
850 Purchase Order (supplier side) You send Purchase orders for fiber, resin and core materials with quantities and requested delivery dates.
856 Advance Ship Notice (supplier side) You receive Fiber, resin and core shipments with the supplier’s material lot and quantity, used to plan receiving and molding.

Other exchanges you may meet

  • OEM portals
  • Revision control outside EDI

Where a trading partner offers an API, a portal or file exchange instead of EDI, ECOM scopes that connection alongside the EDI ones. Functional acknowledgments (997 or 999) report validation results, including rejection; they do not prove business acceptance or ERP posting. Which acknowledgments and business responses each partner expects is confirmed with that partner.

Operational detail

Revisions, lots and oversize parts

The revision of a drawing and the lot of material need to appear with the part. Oversize freight makes carrier coordination part of the order.

  • Batches and certificates

    Shipments are tied to production batches, and customers may expect certificates or test results with the shipment. Those documents come from quality and production systems.

  • Parts, projects and lots

    Composite parts ship to OEM and project customers by part number and revision, with lot or resin traceability where the customer asks.

Connected systems

Systems that send and receive this data

Documents are only useful when they reach the systems that run the business.

  • ERP
  • Quality management
  • Transportation management
  • OEM portals

Onboarding and monitoring

From first requirement to daily exception handling

  1. Confirm the requirement

    Obtain each partner's implementation guide or specification, for example from your OEM or project customer, and agree which documents, versions and data are in scope.

  2. Map to your systems

    Map each document to the fields in your ERP and quality management so the data posts without re-keying.

  3. Test with the partner

    Exchange test documents and review the results with the partner before go-live, including changes, cancellations and error cases, not only the simple order.

  4. Validate, acknowledge and monitor

    A 997 or 999 reports the validation result of the document as received, including rejection; it does not show that the business accepted the content or that your ERP posted it. Business responses are separate: an 855 for orders, an 824 for application errors. Monitoring can show what is late, missing or rejected, once it is set up with you.

  5. Resolve exceptions

    Which failures and late documents are watched, who is alerted and how each is resolved are agreed during onboarding. Rejected or unacknowledged documents can then go to the people who can fix them, with the document and the reason in view.

Example exceptions for composite and fiberglass product manufacturers

Illustrative exceptions and example handling that depends on configuration, not live data
ExceptionExample handling, once configured
Drawing revision on an order does not match productionThe order can be held for review so parts are not made to an outdated revision.
Material lot past its shelf lifeThe lot can be flagged for review before it is used or shipped on a part.

Illustrative examples of exceptions a team in this industry may need to review. Each check compares data from your ERP, WMS, trading partner documents or scans, where those are available. Which conditions are checked, who is alerted and what happens next are configured with you during onboarding. This is not a screenshot of a live system or a list of built-in checks.

How ECOM helps

ECOM products and services that apply

Each partner connects in the way it can support. These products cover the connections and visibility manufacturers need most.

  • PRISM-EDI

    Exchange of schedules, orders, ship notices and invoices with customers and suppliers in X12 or EDIFACT, translated to and from your ERP.

  • PRISM-WebEDI

    Browser-based purchase orders, acknowledgments, ship notices and invoices for suppliers without EDI systems.

  • PRISM-SmartConvert

    Supplier confirmations, invoices and customer orders that arrive as PDFs, emails or scans converted into ERP-ready data.

  • PRISM-SCV

    Monitoring of transactions and exceptions across customer and supplier documents.

Frequently asked questions

Can revisions be tracked?

Revision data is carried on documents where the customer supports it.

Can oversize freight be coordinated?

Tenders and status can be integrated with carriers who support them.

Can batch data and test results be exchanged electronically?

Where a customer asks for batch data or test results in electronic form, it can be mapped from your quality or production system into the document or file the partner specifies. The format is set by that partner.

Do you need our trading partner's implementation guide to start?

It helps, but you can start without one. Tell us who you trade with and which systems you run, and we will help obtain and review each partner's requirements. The guide, not this page, decides the exact documents, versions and rules for that partner.

Talk to an EDI/API expert about composite and fiberglass product manufacturers

Share your trading partners, your ERP, a sample document or the problem that keeps recurring. A completed specification is not needed: a partner guide, a rejected document or a description of the issue is enough to start.