Manufacturing · Chemicals, Plastics and Rubber
EDI and API Integration for Adhesive, Sealant and Resin Manufacturers
Adhesive, sealant and resin makers sell industrial, construction and consumer products in packaged and bulk units, with batch and certificate expectations. ECOM connects orders, batch data, certificates and invoices to your ERP.
What this covers
Products and business models in adhesive, sealant and resin
Products
- Industrial adhesives and sealants
- Construction sealants
- Epoxy and specialty resins
- Consumer adhesives
Business models
- Manufacturers selling to industrial users
- Distributor sales
- Consumer brands
Scenarios
Where adhesive, sealant and resin manufacturers lose time and margin
Recurring problems for this kind of business, how ECOM connects the systems and documents involved, and what you gain. Bring your own example and we will work through it with you.
-
Batch and shelf life
- The problem
- Many products have limited shelf life, so batch and manufacture date matter.
- How ECOM helps
- ECOM carries batch and manufacture or expiry date onto the 856 and can hold a line approaching a customer’s age limit for review.
- What you gain
- Customers receive product within the shelf-life window they expect.
Talk to an EDI/API Expert about batch and shelf life Share a sample 856 Advance Ship Notice, or describe what goes wrong, and we will show how it would map to your ERP.
-
Certificates
- The problem
- Customers may expect certificates with each lot.
- How ECOM helps
- ECOM sends certificates of analysis (863) with the lot where the customer asks.
- What you gain
- Certificates travel with the shipment.
Talk to an EDI/API Expert about certificates Share a sample 863 Report of Test Results and 856 Advance Ship Notice, or describe what goes wrong, and we will show how it would map to your ERP.
-
Mixed pack sizes
- The problem
- Cartridges, pails and totes.
- How ECOM helps
- ECOM maps cartridges, pails and totes to the customer’s items and units.
- What you gain
- Pack sizes post to the right item.
Talk to an EDI/API Expert about mixed pack sizes Share a sample 850 Purchase Order and 856 Advance Ship Notice, or describe what goes wrong, and we will show how it would map to your ERP.
Who you connect with
Trading relationships for adhesive, sealant and resin manufacturers
Typical relationships. Which of them apply, and how each one wants to connect, depends on your business.
- Industrial and assembly customers
- Send schedules and order adhesives and sealants to specification.
- Distributors
- Order packaged products and resell to smaller accounts.
- Retailers
- Replenish consumer adhesives under program rules.
- Raw material suppliers
- Supply resins and additives whose lead times shape batches.
- Carriers
- Move pallets, totes and drums.
Partner guides: Distributor guides · Manufacturer guides · Carrier guides
Typical workflow
Where ECOM connects your systems and trading partners
The pattern below is typical for adhesive, sealant and resin manufacturers, not one partner's confirmed requirements. Each trading partner publishes its own guide; confirm the details with that partner.
- Industrial customer or distributor→Your plant and ERP 850 Purchase Order The customer order: items, quantities, prices, ship-to and requested dates.
- Industrial customer or distributor→Your plant and ERP 862 Shipping Schedule Supplements the 830: shipping and delivery quantities and dates that, under the partner’s rules, supersede the applicable shipping information in the 830. It does not replace the 830 or, on its own, authorize production resources.
- Industrial customer or distributor→Your plant and ERP 860 Purchase Order Change Request Changes to open orders: quantities, dates or cancellations.
- Your plant and ERP→Industrial customer or distributor 855 Purchase Order Acknowledgment The order acknowledgment: confirms the order or reports differences from what was requested, including dates.
- Your plant and ERP→Industrial customer or distributor 856 Advance Ship Notice Batch and manufacture or expiry date.
- Your plant and ERP→Industrial customer or distributor 863 Report of Test Results Certificate or test data per batch.
- Your plant and ERP→Industrial customer or distributor 810 Invoice Bills for what was shipped, tied to the order and the ship notice.
- Your plant and ERP→Raw material supplier 850 Purchase Order Purchase orders for raw materials and monomers with quantities and requested delivery dates.
- Raw material supplier→Your plant and ERP 856 Advance Ship Notice Raw material shipments with quantity, the supplier’s lot and expiry as provided, used to plan receiving and tie lots to batches.
Receive orders and schedules
Orders (850) specify product, pack size and quantity; schedules (862) supplement them with delivery dates.
Batch and fill
Production creates batches and fills packages, recording batch and date.
Ship with batch and certificate data
The 856 reports batch, date and package detail, and test results (863) follow where asked.
Invoice
The 810 follows shipment and ties to the order.
Buy raw materials
Resin and additive orders (850) and supplier notices (856) keep batches on schedule.
EDI and API exchanges
The documents behind the workflow
X12 transaction sets typical for this workflow, with what each carries here. Select a code for the full transaction reference.
| Document | Direction | What it carries for adhesive, sealant and resin manufacturers |
|---|---|---|
| 850 Purchase Order | You receive | The customer order: items, quantities, prices, ship-to and requested dates. |
| 862 Shipping Schedule | You receive | Supplements the 830: shipping and delivery quantities and dates that, under the partner’s rules, supersede the applicable shipping information in the 830. It does not replace the 830 or, on its own, authorize production resources. |
| 860 Purchase Order Change Request | You receive | Changes to open orders: quantities, dates or cancellations. |
| 855 Purchase Order Acknowledgment | You send | The order acknowledgment: confirms the order or reports differences from what was requested, including dates. |
| 856 Advance Ship Notice | You send | Batch and manufacture or expiry date. |
| 863 Report of Test Results | You send | Certificate or test data per batch. |
| 810 Invoice | You send | Bills for what was shipped, tied to the order and the ship notice. |
| 850 Purchase Order (supplier side) | You send | Purchase orders for raw materials and monomers with quantities and requested delivery dates. |
| 856 Advance Ship Notice (supplier side) | You receive | Raw material shipments with quantity, the supplier’s lot and expiry as provided, used to plan receiving and tie lots to batches. |
Other exchanges you may meet
- Customer supplier portals
- Certificate exchange
Where a trading partner offers an API, a portal or file exchange instead of EDI, ECOM scopes that connection alongside the EDI ones. Functional acknowledgments (997 or 999) report validation results, including rejection; they do not prove business acceptance or ERP posting. Which acknowledgments and business responses each partner expects is confirmed with that partner.
Operational detail
Batches, dates and certificates
Many products have limited shelf life, so batch and manufacture date matter. The batch and date on the ship notice must match the container, and the certificate must refer to the same batch.
Batches and certificates
Shipments are tied to production batches, and customers may expect certificates or test results with the shipment. Those documents come from quality and production systems.
Bulk and packaged units
Product ships by tank car, tank truck, drum, tote, bag or pallet. Units, packaging and conversions need to agree across orders and invoices.
Shipping paperwork
Safety and transport paperwork accompanies many shipments. The exchange of order and shipment data supports it; ECOM does not replace your compliance processes.
Connected systems
Systems that send and receive this data
Documents are only useful when they reach the systems that run the business.
- ERP
- Quality management
- Warehouse management
- Customer portals
ERP integration guides: SAP S/4HANA · Oracle NetSuite · Infor CloudSuite Industrial (SyteLine) · QAD MFG PRO · Microsoft Dynamics 365 Business Central · Epicor Kinetic · All ERP guides
Onboarding and monitoring
From first requirement to daily exception handling
Confirm the requirement
Obtain each partner's implementation guide or specification, for example from your industrial customer or distributor, and agree which documents, versions and data are in scope.
Map to your systems
Map each document to the fields in your ERP and quality management so the data posts without re-keying.
Test with the partner
Exchange test documents and review the results with the partner before go-live, including changes, cancellations and error cases, not only the simple order.
Validate, acknowledge and monitor
A 997 or 999 reports the validation result of the document as received, including rejection; it does not show that the business accepted the content or that your ERP posted it. Business responses are separate: an 855 for orders, an 824 for application errors. Monitoring can show what is late, missing or rejected, once it is set up with you.
Resolve exceptions
Which failures and late documents are watched, who is alerted and how each is resolved are agreed during onboarding. Rejected or unacknowledged documents can then go to the people who can fix them, with the document and the reason in view.
Example exceptions for adhesive, sealant and resin manufacturers
| Exception | Example handling, once configured |
|---|---|
| Certificate missing for a batch | The shipment can be held for review until the certificate the customer expects is available. |
| Short shelf life at shipment | The line can be flagged for review so a customer is not shipped product too close to its expiry. |
Illustrative examples of exceptions a team in this industry may need to review. Each check compares data from your ERP, WMS, trading partner documents or scans, where those are available. Which conditions are checked, who is alerted and what happens next are configured with you during onboarding. This is not a screenshot of a live system or a list of built-in checks.
How ECOM helps
ECOM products and services that apply
Each partner connects in the way it can support. These products cover the connections and visibility manufacturers need most.
-
PRISM-EDI
Exchange of schedules, orders, ship notices and invoices with customers and suppliers in X12 or EDIFACT, translated to and from your ERP.
-
PRISM-WebEDI
Browser-based purchase orders, acknowledgments, ship notices and invoices for suppliers without EDI systems.
-
PRISM-SmartConvert
Supplier confirmations, invoices and customer orders that arrive as PDFs, emails or scans converted into ERP-ready data.
-
PRISM-SCV
Monitoring of transactions and exceptions across customer and supplier documents.
Services: Trading partner onboarding · ERP integration · API integration · Fully managed EDI · Supply chain visibility · Mapping and translation
Frequently asked questions
Can certificates be exchanged electronically?
Where the customer asks and your quality system produces them, yes. They are mapped from your records and tied to the batch on the shipment.
Does ECOM verify product quality?
No. Quality assurance stays with your teams. The integration carries the data customers agree to receive.
Can batch data and test results be exchanged electronically?
Where a customer asks for batch data or test results in electronic form, it can be mapped from your quality or production system into the document or file the partner specifies. The format is set by that partner.
Do you need our trading partner's implementation guide to start?
It helps, but you can start without one. Tell us who you trade with and which systems you run, and we will help obtain and review each partner's requirements. The guide, not this page, decides the exact documents, versions and rules for that partner.
Talk to an EDI/API expert about adhesive, sealant and resin manufacturers
Share your trading partners, your ERP, a sample document or the problem that keeps recurring. A completed specification is not needed: a partner guide, a rejected document or a description of the issue is enough to start.