Manufacturing · Packaging, Paper and Printing

EDI and API Integration for Flexible Packaging and Film Manufacturers

Flexible packaging and film makers produce rolls, pouches and bags to customer specification for food, consumer and industrial customers. ECOM connects releases, roll and lot data, resin purchasing and invoices to your ERP.

View all manufacturing industries

What this covers

Products and business models in flexible packaging and film

Products

  • Packaging film and laminates
  • Pouches, bags and sachets
  • Stretch and shrink film
  • Lidding and barrier materials

Business models

  • Converters supplying food and consumer goods makers
  • Film extruders selling to converters
  • Custom printed flexible packaging

Scenarios

Where flexible packaging and film manufacturers lose time and margin

Recurring problems for this kind of business, how ECOM connects the systems and documents involved, and what you gain. Bring your own example and we will work through it with you.

  • Roll and lot traceability

    The problem
    Customers trace rolls to production lots for their filling lines.
    How ECOM helps
    ECOM carries roll, lot and weight detail onto the 856.
    What you gain
    Filling lines can trace rolls to production lots.

    Talk to an EDI/API Expert about roll and lot traceability Share a sample 856 Advance Ship Notice and 863 Report of Test Results, or describe what goes wrong, and we will show how it would map to your ERP.

  • Resin price pass-through

    The problem
    Resin cost changes flow to prices and surcharges.
    How ECOM helps
    ECOM maps resin price references and surcharges to the 810 and compares them with the ERP price basis.
    What you gain
    Resin-driven price changes appear correctly on invoices.

    Talk to an EDI/API Expert about resin price pass-through Share a sample 850 Purchase Order and 810 Invoice, or describe what goes wrong, and we will show how it would map to your ERP.

  • Specification and print versions

    The problem
    Films are specified by structure and print.
    How ECOM helps
    ECOM carries structure and print version references on orders and notices.
    What you gain
    Orders reference the current film and print version.

    Talk to an EDI/API Expert about specification and print versions Share a sample 850 Purchase Order and 856 Advance Ship Notice, or describe what goes wrong, and we will show how it would map to your ERP.

Who you connect with

Trading relationships for flexible packaging and film manufacturers

Typical relationships. Which of them apply, and how each one wants to connect, depends on your business.

Food and consumer goods manufacturers
Send forecasts, releases and orders for film and pouches, with specifications and print versions.
Co-packers and fillers
Order for their filling lines and need rolls to arrive in sequence.
Resin and additive suppliers
Supply polymers whose price formula flows into your price and surcharge.
Ink and adhesive suppliers
Supply consumables for printing and laminating.
Carriers
Deliver rolls and pouches to plants on release dates.

Typical workflow

Where ECOM connects your systems and trading partners

The pattern below is typical for flexible packaging and film manufacturers, not one partner's confirmed requirements. Each trading partner publishes its own guide; confirm the details with that partner.

  1. Packaging customer→Your plant and ERP 830 Planning Schedule with Release Capability Planning forecasts and planned releases from the customer, used to plan production and materials. Planning information, not a firm order.
  2. Packaging customer→Your plant and ERP 862 Shipping Schedule Supplements the 830: shipping and delivery quantities and dates that, under the partner’s rules, supersede the applicable shipping information in the 830. It does not replace the 830 or, on its own, authorize production resources.
  3. Packaging customer→Your plant and ERP 850 Purchase Order The customer order: items, quantities, prices, ship-to and requested dates.
  4. Packaging customer→Your plant and ERP 860 Purchase Order Change Request Changes to open orders: quantities, dates or cancellations.
  5. Your plant and ERP→Packaging customer 855 Purchase Order Acknowledgment The order acknowledgment: confirms the order or reports differences from what was requested, including dates.
  6. Your plant and ERP→Packaging customer 856 Advance Ship Notice Roll, lot and weight detail per shipment.
  7. Your plant and ERP→Packaging customer 863 Report of Test Results Lot test results where a customer asks.
  8. Your plant and ERP→Packaging customer 810 Invoice Bills for what was shipped, tied to the order and the ship notice.
  9. Your plant and ERP→Resin supplier 850 Purchase Order Purchase orders for resin and film stock with quantities and requested delivery dates.
  10. Resin supplier→Your plant and ERP 856 Advance Ship Notice Resin and film-stock shipments with lot and weight, used to plan receiving and extrusion runs.
  1. Forecasts and releases

    Customer forecasts (830) and releases (862).

  2. Orders

    Orders (850) with spec.

  3. Buy resin

    Resin orders (850) and notices (856).

  4. Ship notice with roll data

    The 856 reports rolls and lots; test results (863) can accompany.

  5. Invoice

    The 810 follows.

EDI and API exchanges

The documents behind the workflow

X12 transaction sets typical for this workflow, with what each carries here. Select a code for the full transaction reference.

DocumentDirectionWhat it carries for flexible packaging and film manufacturers
830 Planning Schedule with Release Capability You receive Planning forecasts and planned releases from the customer, used to plan production and materials. Planning information, not a firm order.
862 Shipping Schedule You receive Supplements the 830: shipping and delivery quantities and dates that, under the partner’s rules, supersede the applicable shipping information in the 830. It does not replace the 830 or, on its own, authorize production resources.
850 Purchase Order You receive The customer order: items, quantities, prices, ship-to and requested dates.
860 Purchase Order Change Request You receive Changes to open orders: quantities, dates or cancellations.
855 Purchase Order Acknowledgment You send The order acknowledgment: confirms the order or reports differences from what was requested, including dates.
856 Advance Ship Notice You send Roll, lot and weight detail per shipment.
863 Report of Test Results You send Lot test results where a customer asks.
810 Invoice You send Bills for what was shipped, tied to the order and the ship notice.
850 Purchase Order (supplier side) You send Purchase orders for resin and film stock with quantities and requested delivery dates.
856 Advance Ship Notice (supplier side) You receive Resin and film-stock shipments with lot and weight, used to plan receiving and extrusion runs.

Other exchanges you may meet

  • Customer supplier portals
  • papiNet where used

Where a trading partner offers an API, a portal or file exchange instead of EDI, ECOM scopes that connection alongside the EDI ones. Functional acknowledgments (997 or 999) report validation results, including rejection; they do not prove business acceptance or ERP posting. Which acknowledgments and business responses each partner expects is confirmed with that partner.

Operational detail

Rolls, lots and resin pricing

A filling line stops if the wrong roll arrives. Roll and lot data on the ship notice should match the labeled rolls, and resin-based pricing needs to reflect the agreed formula so invoices are not disputed.

  • Customer specifications

    Packaging and print are made to a customer’s specification, so orders carry specs, artwork or version identifiers that must match what is produced and shipped.

  • Releases and vendor-managed stock

    Customers often issue scheduled releases or have supplier-managed stock at their plants, so forecasts, releases and consumption data matter.

  • Reels, rolls, pallets and weights

    Paper and film ship as reels or pallets, priced by weight or area. Quantities and units must agree across orders, shipments and invoices.

Connected systems

Systems that send and receive this data

Documents are only useful when they reach the systems that run the business.

  • ERP
  • Extrusion and converting systems
  • Quality management
  • Customer portals

Onboarding and monitoring

From first requirement to daily exception handling

  1. Confirm the requirement

    Obtain each partner's implementation guide or specification, for example from your packaging customer, and agree which documents, versions and data are in scope.

  2. Map to your systems

    Map each document to the fields in your ERP and extrusion and converting systems so the data posts without re-keying.

  3. Test with the partner

    Exchange test documents and review the results with the partner before go-live, including changes, cancellations and error cases, not only the simple order.

  4. Validate, acknowledge and monitor

    A 997 or 999 reports the validation result of the document as received, including rejection; it does not show that the business accepted the content or that your ERP posted it. Business responses are separate: an 855 for orders, an 824 for application errors. Monitoring can show what is late, missing or rejected, once it is set up with you.

  5. Resolve exceptions

    Which failures and late documents are watched, who is alerted and how each is resolved are agreed during onboarding. Rejected or unacknowledged documents can then go to the people who can fix them, with the document and the reason in view.

Example exceptions for flexible packaging and film manufacturers

Illustrative exceptions and example handling that depends on configuration, not live data
ExceptionExample handling, once configured
Roll lot missing on a ship notice lineThe shipment can be held for review so a filling line is not stopped by rolls the customer cannot trace.
Resin surcharge differs from the contract formulaThe invoice can be held for review until the surcharge matches the agreed formula.

Illustrative examples of exceptions a team in this industry may need to review. Each check compares data from your ERP, WMS, trading partner documents or scans, where those are available. Which conditions are checked, who is alerted and what happens next are configured with you during onboarding. This is not a screenshot of a live system or a list of built-in checks.

How ECOM helps

ECOM products and services that apply

Each partner connects in the way it can support. These products cover the connections and visibility manufacturers need most.

  • PRISM-EDI

    Exchange of schedules, orders, ship notices and invoices with customers and suppliers in X12 or EDIFACT, translated to and from your ERP.

  • PRISM-WebEDI

    Browser-based purchase orders, acknowledgments, ship notices and invoices for suppliers without EDI systems.

  • PRISM-SmartConvert

    Supplier confirmations, invoices and customer orders that arrive as PDFs, emails or scans converted into ERP-ready data.

  • PRISM-SCV

    Monitoring of transactions and exceptions across customer and supplier documents.

Frequently asked questions

Can roll-level data be sent to customers?

Where the customer asks and your production system captures it, roll, lot and weight can be mapped into the ship notice at the level the customer’s guide specifies.

How are resin surcharges invoiced?

Surcharge logic is in your ERP or pricing system. The integration carries the resulting amounts into the invoice and related documents.

Is there an industry standard for paper and packaging?

The paper and forest industry uses papiNet, and many customers use X12 or EDIFACT instead. ECOM confirms which each trading partner requires during scoping.

Do you need our trading partner's implementation guide to start?

It helps, but you can start without one. Tell us who you trade with and which systems you run, and we will help obtain and review each partner's requirements. The guide, not this page, decides the exact documents, versions and rules for that partner.

Talk to an EDI/API expert about flexible packaging and film manufacturers

Share your trading partners, your ERP, a sample document or the problem that keeps recurring. A completed specification is not needed: a partner guide, a rejected document or a description of the issue is enough to start.