X12 transaction guide · Ordering
EDI 511 Requisition
The X12 document used to requisition material and equipment from a supply distribution system for immediate use or for stock.
- Sent by
- Requisitioning unit or customer
- Received by
- Supply distribution system
- Standard
- ANSI ASC X12
What is an EDI 511?
The EDI 511 Requisition is the ANSI X12 transaction set used to requisition material and equipment from a supply distribution system, either for immediate consumption or for stock against projected requirements.
It was developed for large logistics systems, such as military supply chains, where units order parts from a central supply system rather than directly from vendors. Requisitions carry priorities, required delivery dates and fund codes, and their status is followed through the supply process. Status advice follows each requisition.
How to read this diagram: the top row shows who sends the 511, to whom, and which documents usually come before and after it. The lower part shows what X12 release 008010 itself requires: the envelopes around the 511 and the segments and loops the standard marks as required, area by area. Optional loops are listed by the segment that starts them rather than drawn in full. This is the standard's minimum, not a trading partner's requirement: each partner's implementation guide usually makes some optional loops mandatory, restricts the codes and may use a different release.
When it is used
- Ordering parts from a central supply system
- Replenishing unit stocks
- Requisitioning equipment for projects
Where it fits in the document flow
Structure
Mandatory segments in the 511 (X12 release 008010)
The segments X12 release 008010 marks as mandatory at their level, in order. Segments inside optional loops are needed only when the loop is used. This is the standard's requirement, not your trading partner's: each partner's implementation guide names the release it uses, adds the optional segments it requires and restricts the values. The requirement status comes from one published X12 reference listing and has not been checked against a second source.
- ST
- BR
- LM
- LQ
- N1
- LX
- N9
- QTY
- REF
- FA1
- FA2
- SE
Practical example
The 511 in practice
A maintenance unit needs a replacement pump for a vehicle. Its supply system sends a 511 requisition to the central supply system with the part number, quantity, priority and delivery location. The supply system issues the part from a depot and reports its status.
Implementation
Implementation considerations for the 511
- Use the supply system's part numbers and priority codes.
- Validate funding before submitting requisitions.
- Track requisition status through delivery.
- Cancel requisitions that are no longer needed.
How ECOM helps
Automate the 511 with ECOM
Solution
Procure-to-Pay Automation
Automate purchasing, receiving and supplier invoicing across EDI, portals and documents.
Industry
Industrial Manufacturing
Distributor, OEM customer and supplier integration for industrial manufacturers.
Solution
Logistics Automation
Automate tenders, status updates, freight invoices and warehouse orders with logistics partners.
More general questions about EDI are answered in the EDI FAQ.
Related transactions
Related ordering documents
Need help with the EDI 511?
ECOM maps, tests and monitors X12 documents for your trading partners and integrates them with your ERP.